While at the Australian Hotel and Brewery the other day we looked in on the brewery and saw that the canning line has finally started to be installed.
It looks like the empty cans will be loaded into a staging area at the top of the photo near the hand railing. before being sent down a chute on the right hand side into the filling station (The big stainless box in the middle with all the air lines coming out of it). As it comes out of there, a lid drops down a wire slide and lands on top of the can.
Moving to the left again, the can and lid are rotated while rollers press the edges of the lid on to the can, sealing it. It looks like the cans are then washed before being packed.
Hopefully I will be able to bring you footage soon of the line in operation.
No comments:
Post a Comment